OreOrbit by Bohemia Defense

Graphite

Balama

One of the few large graphite mines outside China.

Material
Graphite
Stage
Mine
Place
Cabo Delgado, Mozambique
Operator
Syrah Resources
Coordinates
13.31° S, 38.65° E (approximate)
Satellite picture of Balama
Sentinel-2 true colour, 28 Oct 2026, about 7.0 km across. Vegetation lost since 20 Oct 2019: about 1168 ha. Copernicus Sentinel-2 data via Microsoft Planetary Computer.

Seen from orbit

Heat
3 of the last 7 days and 5 of the last 30 had furnace-hot pixels within 6 km (NASA FIRMS).
Surface temperature
Landsat, 21 Oct 2026: typical ground 51.3 °C; 1.2 ha more than 8 °C warmer than the land around it; hottest spot 11.0 °C above it.
Armed conflict
9 events within 100 km so far this year, the latest on 22 Sep 2026 (UCDP).
Radar
Latest Sentinel-1 radar picture: 24 Oct 2026.

Signals show activity, not output. They are measured automatically and can be affected by weather, terrain and fires.

Facts

  • Capacity of about 350,000 t a year of graphite concentrate
  • Feeds Syrah's anode plant in Vidalia, Louisiana
  • Operations suspended in December 2024 after protests
  • Mozambique mined about 75,000 t of graphite in 2024 (USGS)

Open Balama on the globe