Gallium

Metlen gallium project

Europe's main bet to cut its reliance on Chinese gallium.

Material
Gallium
Stage
Planned project
Place
Agios Nikolaos, Boeotia, Greece
Operator
Metlen (Aluminium of Greece)
Coordinates
38.37° N, 22.69° E (approximate)
Expected online
Q3 2027
Satellite picture of Metlen gallium project
Sentinel-2 true colour, 21 Oct 2026, about 7.0 km across. Vegetation lost since 26 Oct 2018: about 282 ha. Copernicus Sentinel-2 data via Microsoft Planetary Computer.

Seen from orbit

Heat
0 of the last 7 days and 0 of the last 30 had furnace-hot pixels within 6 km (NASA FIRMS).
Surface temperature
Landsat, 19 Oct 2026: typical ground 22.1 °C; 1.7 ha more than 8 °C warmer than the land around it; hottest spot 8.7 °C above it.
Radar
Latest Sentinel-1 radar picture: 28 Oct 2026.

Signals show activity, not output. They are measured automatically and can be affected by weather, terrain and fires.

Facts

  • Planned capacity: 50 t of gallium a year, commercial output from Q3 2027
  • Selected as a Strategic Project under the EU Critical Raw Materials Act (2025)
  • EIB approved €90 million, announced 15 January 2026
  • Gallium was about $3,500/kg in October 2026, up from under $500 when Metlen decided to invest